NG Bailey (Bristol)  
   
Operating in the UK and Europe, NG Bailey design, build, operate and maintain building infrastructure and IT services.
   
Step one
 
A site visit was arranged by the project manager of L&TA in Sheffield to meet and discuss the plans for the new office installation for their new office based in Bristol. Hard hats and steel toe cap boots were required as the the building was being took back to it's shell.
 
Step two
 
Planning meetings for the two floor full refit
   
Step three
   
Trip to manufacturers to discuss and view best fit furniture as per plans
   
Step four
   

Sample furniture delivered to existing site to introduce to staff

   
Step five
   

Meeting with facilities manager to discuss removal of existing office furniture. Old furniture to be removed and recycled.

   
Step six
 
Trip back to new location to proof read architects final measurements as per plan
 
Step eight
 
Final meeting with install team and electricians
   
Step nine
   
Full installation including IT, total time 4 days
   
         
         
 